Roof Type

Flat roof

Mounting Type

East-west system

Project Type

Logistic centre

Installed kWp

954.75

Collaborative excellence for Seacon Logistics

How professional execution and collaboration powered a photovoltaic success in Venlo

Discover how Seacon Logistics made its company building future-ready achieving energy self-sufficiency with a 954.75 kWp system using novotegra.

Icon/20x20/Arrow-left Created with Sketch. Venlo, Netherlands

Setting the scene

In Venlo, the Netherlands, the Seacon Venlo project has become a showcase for successful collaboration between various stakeholders. With a goal of self-supply and a flat roof installation using an east-west mounting system, the project was ambitious and forward-thinking.

 

Meeting the challenges

Achieving a seamless installation with no energy feed-in posed significant challenges. The project also needed to accommodate future retrofitting of a battery storage unit, requiring detailed planning and expert execution.

 

The result

The success of the Seacon Venlo project was driven by the professionalism of HMB GmbH and the collaborative efforts of key individuals like Volker Dworak, Arne Helmer, and Peter Rabenstein. Utilizing the planning software Solar Planit, the project was completed within six months, delivering a powerful 954.75 kWp system. This project highlights the impressive results that can be attained through effective teamwork and proficient project management.

 

 

More about the system

 

More impressions

Contact